Sydney Water Culverts, Sydenham

Sydney Water Culverts, Sydenham NSW

Client: Transport for NSW

Project: Sydney Metro Trains Facility South

Cost: $60M 

Size: 1,000m of trunk stormwaer

We are the structural engineers managing the design documentation and site phase services for 1,000m of trunk stormwater culverts deviation beneath the proposed train stabling yard at Sydenham for the Sydney Metro project.

The culvert sizes ranged from 2100 x 1200 to 4200 x 2300. Additionally, the deviation of the culvert system required significant stakeholder liaison with Sydney Water and TransGrid.

Structural assessment of existing stormwater channels and preliminary design of temporary works to facilitate construction.

The detailed design included careful consideration of flotation, hydrostatic pressure, fatigue design, crack control, heavy load scenarios such as road vehicle and railway loading, 100 year design life, detailing for precast culverts, and connecting to existing structures.